Retort Curry Production Line
Retort Curry Production Line
In the curry production line, the old air cylinder caused jams and delays. The switch to the EleCylinder EC-S7SR fixed these issues, resulting in stable production without interference from surrounding equipment. Jams occurred five times a day, and each took 5 minutes to resolve. The speed instability was eliminated.
The EleCylinder provides stable performance, with no jams, delays, or overtime needed. The result is an annual profit of $4,826 USD and more efficient, uninterrupted production.
EC-S7SR